Location: South San Francisco, CA
Collaborators: Kier + Wright

The goal

The project had stalled. A City delay paused it, and when it restarted the clock was tight. The developer needed approval within a month or the project would drop back to a second City Council review, which meant more time, more cost, and more risk on the pro forma. The previous landscape architect had gone quiet, and the drawings needed to move.

What we did

We stepped in and rebuilt the landscape set on a fast timeline, recreating the prior work so the project didn’t lose ground. Before resubmitting, we ran a code analysis on the existing plans and found three items that were out of compliance. We corrected them before they reached the City, so they never became a review comment or a reason for delay.

The results

The developer hit their deadline. The project was approved in two rounds and avoided the second Council hearing entirely.

3800 Maybelle Avenue,
Oakland CA 94619,
916 716 9331

CA Landscape Architect
#6255

Email us at
[email protected]

Instagram
LinkedIn
Substack